r/Concrete • u/Screederone • 3h ago
Concrete Pro With a Question Big Pour 36 trucks
A Day in the Life of a Concrete Screeder – Back in the Day
5:00 am – Alarm goes off.
Coffee starts straight away 14 cups before I leave and it never really stops
6:00 am – On site. More coffee while the crew gets organised.
7:00 am – Pour starts.
Six of us in the gang.
36 concrete trucks. 1,800 m².
I was the only screeder.
From 7:00 to 11:00, it was flat out. Every square metre screeded by me.
No breaks. Just keep moving.
Then straight into finishing.
By 3:30–4:00 pm, the slab was burnt in with a top-quality finish.
5:00–7:00 pm – Pub with the boys. Back then it wasn’t unusual to knock back 20–30 beers.
Home around 6:30 pm.
Dinner.
Another coffee.
Bed.
Then the alarm goes again at 5:00 am.
Tomorrow?
A 2,400 m² car park.
Same crew.
Same pace.
Same work ethic.
I don’t drink coffee like that anymore, and the cigarettes are long gone—but those were the days. Hard work, big pours, and a lot of pride in the finish.
Sent from my iPhone