r/ArtemisProgram • u/Affectionate-Reason0 • 10d ago
Discussion Artemis 3 June launch?
I’ve seen a few things that have said it’s targeted for a launch in June, can anyone else confirm or deny it? I genuinely can’t see it launching in June
21
u/kchuvala 10d ago
Coordinating launches by NASA, SpaceX, and Blue Origin means a lot of things need to go according to plan without any unforseen delays or complications.
So is June 2027 possible? Yes.
Is it likely? I'd say no.
But as another respondent says, that is our work-to target, and we're working like crazy to make sure it remains possible.
My team works on the "IT" computing devices for the mission - tablets, iPhones, etc. (not avionics or flight control systems.) We are packing a lot of new stuff into this schedule, based largely on feedback from the Artemis II crew.
Exciting times!
7
10d ago
[deleted]
5
u/kchuvala 10d ago
Oh, man, are you preaching to the choir. ;)
However, we work to requirements. So Windows, Linux, and iOS.
One out of 3 ain't bad, right?
1
u/Disastrous_Run_5968 10d ago
you work for Blue Origin, NASA, or SpaceX?
3
9
u/literalsupport 10d ago
SpaceX won’t be ready.
Neither will Blue Origin.
2
u/RocketVerse 10d ago
Regarding SpaceX, the requirements are pretty easy. It’s a standard starship with a docking port. Basically the same thing that they’re launching in a few weeks to orbit. Now Blue Origin, yeah who knows, but they’ll probably have the actual capsule ready by then, so as long as they’re not grounded, I think there is a decent chance.
Of course, that’s the deciding factor, they’re the core of the mission. I give it a 20% chance it launches in June, but 50-60 that it works later that year.
5
u/peaches4leon 9d ago edited 7d ago
Starship doesn’t even have a standalone RCS yet, or a backup. Its a minimally integrated network of relief valves from the main tanks to a few directional ports. Fed by boil-off pressure and the COPVs right behind them. Unless they’ve been making changes in the background (for future SNs), the redundancy to cooperate with Orion just isn’t there yet.
I doubt Orion is going to be totally responsible for attitude control while attached to a vehicle many times its size/mass.
0
5
u/OkAbrocoma695 9d ago
The only thing that will be ready by June is the Artemis rocket itself (no guarantee here but thats the current schedule). No one actually thinks blue or spacex will be ready by then.
1
u/Decronym 9d ago edited 2d ago
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
| Fewer Letters | More Letters |
|---|---|
| COPV | Composite Overwrapped Pressure Vessel |
| DMLS | Selective Laser Melting additive manufacture, also Direct Metal Laser Sintering |
| ICPS | Interim Cryogenic Propulsion Stage |
| JSC | Johnson Space Center, Houston |
| LEO | Low Earth Orbit (180-2000km) |
| Law Enforcement Officer (most often mentioned during transport operations) | |
| RCS | Reaction Control System |
| SLS | Space Launch System heavy-lift |
| Selective Laser Sintering, contrast DMLS | |
| SN | (Raptor/Starship) Serial Number |
| Jargon | Definition |
|---|---|
| Raptor | Methane-fueled rocket engine under development by SpaceX |
| cryogenic | Very low temperature fluid; materials that would be gaseous at room temperature/pressure |
| (In re: rocket fuel) Often synonymous with hydrolox | |
| hydrolox | Portmanteau: liquid hydrogen/liquid oxygen mixture |
Decronym is now also available on Lemmy! Requests for support and new installations should be directed to the Contact address below.
8 acronyms in this thread; the most compressed thread commented on today has 12 acronyms.
[Thread #457 for this sub, first seen 23rd Aug 2026, 08:37]
[FAQ] [Full list] [Contact] [Source code]
1
u/Beginning-Use7258 2d ago
I hope it would be june 2027, just have to hope politics and systems don’t get in the way
0
u/flyingrichie 10d ago
They say death and taxes are the only things you can always count on, but I add a third. Space flight timelines
-4
50
u/LNA-Big_D 10d ago
That’s the official target from the program. Based on the status of the HLS options though, I doubt that’s when we’re going. My team is currently scrambling to be ready by then though, so we shouldn’t be the ones fingers are pointed at at least.