r/Ironworker • u/TheGrinchesBongWater • 13d ago
Rigging question
We were unloading bundles of 60' #6 rebar and it was not going well. The bundles kept folding. We eventually got everyrhing done with a few extra straps and some trial and error but I'm wonderin if anyone here has any advice for unloading rebar like that. One load our method ended up being 4 straps and chain spreaders. The second load there were some #11 bundles that we rigged with the 6s to help fight the bend. All done with an excavator.
2
u/khawthorn60 13d ago
if you can use a spreader bar. if not 25/50 rule to start you might have to adjust from there.
2
u/Alarmed_University_2 11d ago
Yes ive operated and moved rebar for years. You can get spreader bar with extentions or chains have worked id run them 10/15 feet from eachh end on a swivel. And tag line
2
2
u/Glad_Sort4965 13d ago
I ain’t never seen 60 foot rebar.
1
u/TheGrinchesBongWater 12d ago
We dont run into it often but when we do its usually a pain in the ass
1
u/Pgaccount 13d ago
Sling 1/4 of the way in on both sides to keep the weights even
3
u/TheGrinchesBongWater 13d ago
3
u/Geekquinox 12d ago
If you cant haul a spreader beam with you this seems like a perfectly reasonable option.
3
u/Frequent-Ad-877 12d ago
That is terrible planning by your boss. Somebody had to be aware that you were going to be getting 60ft bars that day and should have had a plan for it.
In my opinion you either need a crane with longer spreaders, or 2 telehandlers/ excavators if that's what's on site.
You guys were setup for failure, but did what you had to do to get the truck off loaded and get to work.
Keep in mind that coated bar is really slick and rigging can slide on it. I'm all for finding a way to get the job done with what you got, just make sure you don't get someone hurt in the process.
1
u/SoaringOnTheWind 13d ago
I’ve only ever used 2 points with chokers with long rebar. I go 1/4 from the ends and usually get pretty straight loads.
2
u/TheGrinchesBongWater 13d ago
That was what we did on the first attempt. I think half the problem was that it wasnt a very big bundle. Not enough there to keep it stout enough.
2
u/LeakyDishwasher 12d ago
At that length of bar and being a #6, I would say the main issue is the sling angle. You might not be able to do it with the excavator if you have to travel with it. You need to use 2 pick points. Come 13'6"off each end with you slings but lengthen them to reduce the sling angle.
1
u/Impressive-Mud5074 13d ago
I've never rigged long rebar before, but if i had a bending issue, i would put the rebar on a channel or beam to give more rigidity.
2
u/TheGrinchesBongWater 13d ago
We didnt have one on this job. The crew im with do almost nothing but bridges and we arent loved enough to get a company truck to carry the big helpful equipment with lol

10
u/SoaringOnTheWind 13d ago
Make sure that your choker eyes are on the same side to combat the twisting.