r/TheBrewery 1d ago

Glycol Loop ... First or second?

There will be a pressure bypass valve, pressure gauges, etc..

Sorry I have posted this before but actually going to re-pipe it this weekend since im adding a chiller and the two sets of 3 tanks. Basically I would just save a pipe on the second picture since there will only be 3 pipes coming from the middle row.

21 Upvotes

16 comments sorted by

16

u/oranjebeered 1d ago

The middle return leg on the second one is going to cause an imbalance in the system. It might not be big enough to notice depending on your headers and pump head. The first one would be the most correct one.

5

u/GoodolBen Brewer 1d ago

First will work better and cost more in material.

5

u/sailingthr0ugh 1d ago

First and it isn’t close

3

u/cbowl300 1d ago

In the first setup, the 3 tanks furthest from the chiller, the incoming (purple) is coming off the return line (red)?

8

u/SamTheBrewer Brewer 1d ago edited 1d ago

First, FIFO

24

u/Ningr861 1d ago

It’s not FIFO in glycol it’s FILO

11

u/brewerbrendan Brewer 1d ago

Yep. First in last out.

0

u/SamTheBrewer Brewer 1d ago

Interesting! like the pastry I presume ?

I usually number the tanks, so tank 1 is the first tank in and tank 1 is the first tank out joining the return

9

u/brewzer Brewer/Owner 1d ago

Agreed and don't forget to plumb your jackets in parallel and not in series

2

u/kevleyski 19h ago

First seems better, equal pressure with shortest in longest out

1

u/Nudletje 1d ago

But can we ask why not 2 rows?

2

u/Artistic_Return_1091 23h ago

There are other tanks! HLT, CLT, brewhouse on one of the sides (Just did not draw them)

1

u/TiminOz 12h ago

If you send me an email address I can send you a glycol plumbing layout.

1

u/tahmores101 Brewer 1d ago

First. I feel like this is a roundabout vs a three way stop situation for the return flow. Yes it will cost more for the construction, but "traffic" is moving vs waiting their turn.

1

u/[deleted] 1d ago

[deleted]

4

u/i_aint_bobby 1d ago

Not OP, but what you correctly mention as being the goal is what the first drawing accomplishes. The first tank to receive supply, i.e. shortest supply path, is also the one where the return path is the longest.

-6

u/ThiccBoiCaddy 1d ago

Second for sure