30
8
u/Scrawf53 13d ago
That’s not too bad really. It’s the ones where you cannot see the equipment for cables that are a problem ha ha
2
u/immoloism 13d ago
Even those start looking good after you get you first cabinet where you make the client sign a waiver form before you start.
6
u/zmannz1984 13d ago
Eh. Looks like most of the small biz racks in my area. Just needs some org on the patch cables. I have given up keeping some of mine clean because my customers keep me busy messing with shit they shouldn’t and wreck it anyway. I work for a doctor that likes to change connections at random when there is any small problem, even wifi issues.
2
13d ago
[removed] — view removed comment
1
u/zmannz1984 13d ago
Well this guy thinks he understands electrical engineering. Every time their mesh network loses a node, he thinks it is a “ground plane issue”. In reality, the farthest nodes are plugged into gfci-protected receptacles alongside their lab equipment because he won’t even pay for me to run a dedicated circuit to the nodes, much less new drops to make them into actual wired nodes.
They have one autoclave type thing that rarely gets used, but when they do, it has enough humidity around to trip the gfci at random until it gets up to temp. The random trips usually keep the mesh nodes off long enough that they go into a default mode and they won’t recover without initiating the connection from the controller. So between the time they call and i get there, there are usually enough patches moved around that i couldn’t effectively troubleshoot without a visit, then i have to get there and figure out what connections got moved. We are going on 6 months of this repeating and he still doesn’t get it. Thankfully the management for the property does get it and has basically automated forwarding all the extra charges to their TI account, so i always get paid.
2
u/dj-marcus-puxel9 13d ago
Das kenne ich, war mal itvadmin bei einem Zahnarzt. Und das password von Mailserver das in etwa wie e3f4g5 lautete durfte man natürlich auch keinesfalls ândrrn 😡
3
3
2
u/Jeff-J777 13d ago
That is not a horror rack, that is just a normal rack. On a scale of 1 to 10 I give it a 2. I have seen far far far wose.
2
u/LerchAddams 13d ago
I can still see equipment back there.
Steel yourself, there other fates worse than this that await you.
2
1
1
u/ISCSI_Purveyor 13d ago
Forget the rack. Let's talk about the schmoo that is on the top of the server to the right of the rack.
1
1
1
1
u/ech0cide 13d ago
i will never understand the "old guard" using so many patch panels for no reason. that rack could be condensed to a half cab with one panel
1
1
1
1
1
1
u/MaleficentCustomer55 13d ago
While not the nicest looking rack, I'm more concerned about the step stool to the right of the rack.
1
u/X-KaosMaster-X 13d ago
I bet I could trace a wire faster in that, rather then having to undo the CLEAN wire management....🤯
1
1
u/Ethernetman1980 13d ago
You could consolidate that all into one patch panel and some 1ft patch cords and move the Catalyst up and the whole rack would look way cleaner. I've got no room to talk though I do no sooner get one cleaned up and it needs it done again. Hard to do if the company never gives you any scheduled down time to do it.
1
u/rootofallstevil 13d ago
My old job had 2 6509's fully populated with cat5e in a cabinet without any cable management. We called it the water fall and the cables were so dense you couldn't see either switch.
1
u/greenscoobie86 13d ago
This is great. I live for stuff like this. Cleaning this up is so rewarding 🙃
1
1
1
u/PocketBanana0_0 13d ago
Sometimes I want to post old POTS and phone systems that are outside in peds and rhino cabinets, that shit dunks on most rackmount systems
1
u/wireknot 13d ago
It looks like, in the beginning, there were cable chases/tie points available, but no one took advantage of them. Looks like a project for you!
1
1
1
1
1
1
1
1
u/Genoblade1394 12d ago
Uh that’s a walk in the park, I setup mine with 6inch cables and all, come back in 9 to 12 mo and my workstation tech have it a gory mess grrrrr
1
1
1
1
1
1
u/Jeffs_Tech_Account 11d ago
I love reading all of these comments from network / cable guys.
As an IT Manager, I looks at something like this, and say to myself, "a little untidy....but not too bad." LOL
1
1
1
u/come_ere_duck 8d ago
Not terrible from what I've seen but definitely could do with a tidy up, could knock this out in 1 day.
1
u/Danowolf 7d ago
That four hours clean up. Only casualty is the user's disconnected "inadvertently".
0
u/Unhappy_Assist_6351 12d ago
Where is the horror?
Is there a dead rat at the bottom of the rack?
This is nearly neat. Even cute.
1
u/MisterHole123 3d ago
Not too bad tbh. This is very average. Not every network guy will spend hours obsessing with cable management and for good reason. It works regardless
35
u/thedarbo 13d ago
Brother that is calm. Maybe 48 cables