r/cablegore 13d ago

Miscellaneous Horror rack

Post image
228 Upvotes

65 comments sorted by

35

u/thedarbo 13d ago

Brother that is calm. Maybe 48 cables

9

u/Cavalol 13d ago

Yeah, this isn’t clean but you could still follow any of the cables from one end to the other. Hardly gore

3

u/mindedc 13d ago

I'll never forget the day I walked into an on-site contracting job and the customer wanted me to take a look at a chassis switch. The question I had was where was the dammed switch. There were probably 6 racks in the room and the layer of patch cables over the gear was easily 6+ inches, no lights, fan noise, etc.. I've now (25 years later) seen worse but that was the most shocking way to see a truly bad idf...

2

u/neopod9000 13d ago

Yeah, go ahead and add 4 more racks and then make them all plug into this one.

2

u/thedarbo 13d ago

You must have seen my environment

30

u/Bourriks 13d ago

First day ?

I've seen worse and dirtier.

10

u/OldGuySOB 13d ago

Much worse !

7

u/soupeh 13d ago

Daily

8

u/Scrawf53 13d ago

That’s not too bad really. It’s the ones where you cannot see the equipment for cables that are a problem ha ha

2

u/immoloism 13d ago

Even those start looking good after you get you first cabinet where you make the client sign a waiver form before you start.

6

u/zmannz1984 13d ago

Eh. Looks like most of the small biz racks in my area. Just needs some org on the patch cables. I have given up keeping some of mine clean because my customers keep me busy messing with shit they shouldn’t and wreck it anyway. I work for a doctor that likes to change connections at random when there is any small problem, even wifi issues.

2

u/[deleted] 13d ago

[removed] — view removed comment

1

u/zmannz1984 13d ago

Well this guy thinks he understands electrical engineering. Every time their mesh network loses a node, he thinks it is a “ground plane issue”. In reality, the farthest nodes are plugged into gfci-protected receptacles alongside their lab equipment because he won’t even pay for me to run a dedicated circuit to the nodes, much less new drops to make them into actual wired nodes.

They have one autoclave type thing that rarely gets used, but when they do, it has enough humidity around to trip the gfci at random until it gets up to temp. The random trips usually keep the mesh nodes off long enough that they go into a default mode and they won’t recover without initiating the connection from the controller. So between the time they call and i get there, there are usually enough patches moved around that i couldn’t effectively troubleshoot without a visit, then i have to get there and figure out what connections got moved. We are going on 6 months of this repeating and he still doesn’t get it. Thankfully the management for the property does get it and has basically automated forwarding all the extra charges to their TI account, so i always get paid.

2

u/dj-marcus-puxel9 13d ago

Das kenne ich, war mal itvadmin bei einem Zahnarzt. Und das password von Mailserver das in etwa wie e3f4g5 lautete durfte man natürlich auch keinesfalls ândrrn 😡

3

u/CLE-Mosh 13d ago

My sweet summer child....

3

u/whippy_grep 13d ago

Bless your heart, son.

2

u/Jeff-J777 13d ago

That is not a horror rack, that is just a normal rack. On a scale of 1 to 10 I give it a 2. I have seen far far far wose.

2

u/LerchAddams 13d ago

I can still see equipment back there.

Steel yourself, there other fates worse than this that await you.

2

u/SeaPersonality445 12d ago

Why the drama? Is it your first day?

1

u/mondychan 13d ago

far from bad

1

u/ISCSI_Purveyor 13d ago

Forget the rack. Let's talk about the schmoo that is on the top of the server to the right of the rack.

1

u/Cosomeister 13d ago

Not a server but a UPS. Whats is it doing? No idea, not gonna touch it

1

u/Y-Master 12d ago

I think this ups is used as a ladder for 10 years 🤣

1

u/JohnCulhane 13d ago

Doesnt look to bad.

1

u/ech0cide 13d ago

i will never understand the "old guard" using so many patch panels for no reason. that rack could be condensed to a half cab with one panel

1

u/Mediocre_Contract984 13d ago

you are on ingining things

1

u/Wysguy_J 13d ago

that looks pretty good compared to some of the closets I've worked in

1

u/Kanjii_weon 13d ago

not horror if it works!

1

u/SpaceGuy1968 13d ago

That's an amateur mess.... Like low ball amateur

1

u/Twout_Catcher_2009 13d ago

That’s PG Horror

1

u/MaleficentCustomer55 13d ago

While not the nicest looking rack, I'm more concerned about the step stool to the right of the rack.

1

u/X-KaosMaster-X 13d ago

I bet I could trace a wire faster in that, rather then having to undo the CLEAN wire management....🤯

1

u/19RockinRiley69 13d ago

Wait wait wait, what is being used as a step, is that a server or ups???

1

u/Ethernetman1980 13d ago

You could consolidate that all into one patch panel and some 1ft patch cords and move the Catalyst up and the whole rack would look way cleaner. I've got no room to talk though I do no sooner get one cleaned up and it needs it done again. Hard to do if the company never gives you any scheduled down time to do it.

1

u/indvs3 13d ago

This is horror in the same way that the Simpsons Halloween specials are horror.

1

u/rootofallstevil 13d ago

My old job had 2 6509's fully populated with cat5e in a cabinet without any cable management. We called it the water fall and the cables were so dense you couldn't see either switch.

1

u/greenscoobie86 13d ago

This is great. I live for stuff like this. Cleaning this up is so rewarding 🙃

1

u/thepfy1 13d ago

That's just a normal rack.

1

u/broesel314 13d ago

20 bucks on the batteries in that UPS are dry as a nuns nasty

1

u/waltotheter 13d ago

Ya this is an easy one

1

u/PocketBanana0_0 13d ago

Sometimes I want to post old POTS and phone systems that are outside in peds and rhino cabinets, that shit dunks on most rackmount systems

1

u/wireknot 13d ago

It looks like, in the beginning, there were cable chases/tie points available, but no one took advantage of them. Looks like a project for you!

1

u/loganwachter 13d ago

Just pulled a catalyst 3750 out of production today. Workhorses to the max.

1

u/sugafree80 12d ago

The horror is outside of that rack....is this in a jungle?

1

u/Sevokaz 12d ago

I've seen worse.

1

u/linux-usr69 12d ago

It's bad, but I've seen worse. Much much worse

1

u/Y-Master 12d ago

Not clean but not an horror story. Give me 1 hour and this will be clean again.

1

u/Realistic-Concept766 12d ago

This rack will tell you horror stories at night

1

u/Extra_Housing_2721 12d ago

I've seen worse

1

u/pabskamai 12d ago

Not that bad …

1

u/Genoblade1394 12d ago

Uh that’s a walk in the park, I setup mine with 6inch cables and all, come back in 9 to 12 mo and my workstation tech have it a gory mess grrrrr

1

u/Peetahbread 12d ago

You must have very clean shoes and hands if you that that's a nightmare.

1

u/Ok-Smoke-3359 12d ago

"Petit joueur" !

1

u/english_mike69 12d ago

That is just a minor disturbance in the force…

1

u/Fractional-_- 12d ago

I've seen much worse

1

u/techsavior 12d ago

You must be new here.

1

u/Jeffs_Tech_Account 11d ago

I love reading all of these comments from network / cable guys.
As an IT Manager, I looks at something like this, and say to myself, "a little untidy....but not too bad." LOL

1

u/Sharkwagon 10d ago

This isn’t even the worst rack I’ve seen this week

1

u/BrightAsparagus7810 9d ago

I've seen much worse

1

u/come_ere_duck 8d ago

Not terrible from what I've seen but definitely could do with a tidy up, could knock this out in 1 day.

1

u/IGDFC 7d ago

Tardas más en averiguar que cable va en cada puerto que en ordenarlo, sin VLANes en 1h está hecho

1

u/Danowolf 7d ago

That four hours clean up. Only casualty is the user's disconnected "inadvertently".

0

u/Unhappy_Assist_6351 12d ago

Where is the horror?

Is there a dead rat at the bottom of the rack?

This is nearly neat. Even cute.

1

u/MisterHole123 3d ago

Not too bad tbh. This is very average. Not every network guy will spend hours obsessing with cable management and for good reason. It works regardless